General seamless steel pipe production process can be divided into cold-drawn seamless steel pipe and hot-rolled seamless steel pipe. The production process of cold-rolled seamless steel pipe is generally more complicated than hot-rolled steel. The pipe blank must be firstly rolled by three rollers. After pressing, the sizing test is performed. If the surface does not respond to cracks, the circular tube is cut by a mower to cut a blank having a length of about one meter. Then enter the annealing process, annealing with acidic liquids for pickling, pickling should pay attention to the surface whether there is a lot of blistering, if there is a large number of blisters generated that the quality of the steel tube can not meet the standard response. Appearance of cold-rolled seamless steel pipe is shorter than hot-rolled seamless steel pipe, cold-rolled seamless steel pipe wall thickness is generally smaller than the hot-rolled seamless steel pipe, but the surface looks brighter than thick-walled seamless steel pipe, the surface is not too More rough, caliber does not have too many glitches.
The delivery status of hot-rolled seamless steel tubes is generally after hot-rolled and heat-treated. After the hot rolled seamless steel tubes undergo quality inspection, they must be strictly hand-selected by the staff. After the quality inspection, surface oiling is performed, followed by several times of cold drawing experiments, and after the hot rolling treatment, perforation tests are performed. If the perforation enlargement diameter is too large, straightening correction is required. After straightening, it is transported by the transmission device to the flaw detection machine to carry out the flaw detection experiment. Finally, it is labeled and placed in the warehouse after specification.
The above information sources: 51 steel pipe network
お問い合わせ

Author:

Mr. lee

Phone/WhatsApp:

+8615864350397

人気商品
企業ニュース
亜鉛メッキ鋼板

December 14, 2023

亜鉛メッキ鋼板

December 14, 2023

You may also like
Related Categories

この仕入先にメール

タイトル:
携帯電話:
イーメール:
メッセージ:

Your message must be betwwen 20-8000 characters

お問い合わせ

Author:

Mr. lee

Phone/WhatsApp:

+8615864350397

人気商品
企業ニュース
亜鉛メッキ鋼板

December 14, 2023

亜鉛メッキ鋼板

December 14, 2023

Copyright ©2024 Shandong Rizhaoxin Metal Products Co., Ltd.著作権を有します

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

送信